Design, supply, integrate all equipment 4 Large 1750kw Drop Over Generator Sets. The Construction is designed to meet 65 decibels at 7 meters distance.
Design, supply, integrate all equipment and test 4 large E-room for the G3 Grain Terminal in Vancouver. Units Included: PDC’s, MV Swg, MCC’s, UPS, Fire Detection, Roof Mount HVAC, and Ducting.
Design, supply, and manufacture 1 UNOLS Control center consistent of 3 individual containers. Each Container can operate individually or as a combined unit.
Design, supply, integrate all equipment and test 2 UTC Operator Cabins. Complete with Shatter Proof Glass, Chair with Built-in Control, and Remote I/O Panel
Manufacturing of two portable scientific control vans with interior liners and floor matting. The vans are joinable, complete with sealant and cover panels.
Design, Manufacture, Test and Ship two modular electrical & hydraulic power supply buildings for Suncor’s South Tailings Pond (STP) Mature Fine Tailings (MFT) project.
Design, supply, integrate all equipment and test 26 E-Houses and Drive Buildings for TransCanada Corp., TransCanada Keystone Pipeline Expansion Project