Project Specifics

    In March of 2018 City of Delta began construction on upgrading the Boundary Bay Fire Hall 4. The project was to replace the existing Fire Hall and create an emergency operations center, training facility for live fire and confined space training, and training space for the City of Delta Staff.

    Empty section. Edit page to add content here.

    Sonic Enclosures was contracted by Cullen Power Diesel to Design, supply, integrate all equipment and Generator for (1) 80kw Skin tight Generator Set. The Generator set will be used as back up power in case of an outage. The enclosure itself was constructed out of Aluminum and contained sound dampening aspects as well as service hatches.