Project Specifics

    In 2015 Boise Cascade devoted $43m to upgrading its Florien plywood mill to increase capacity. The project includes the replacement of 2 dryers, new press equipment, increase manufacturing capacity and yard space, etc.

    Sonic was contracted by Boise to design and fabricate the UTC Operators Cab. The build included an operator’s chair with “Coffee Catch” floor slider, Shatterproof glass, remote I/O panel integration, window de-fogging, heat and air conditioning, and basic electrical.