Project Specifics

    Mount Milligan Mine will produce 2.2 billion pounds of copper and 5.7 million ounces of gold over its 22-year life cycle. Currently, The Mine has a throughput of 60,000 Tons of material per day(tpd) which will increase 2,500 tpd after the commissioning of a secondary crushing circuit.

    Sonic Enclosures Ltd worked with Terra Nova Technologies to develop an Electrical House that exceeded regulatory standards.

    Sonic Enclosures Ltd produced the Electrical House to client specification and delivered the building on time with zero defects.

    Click on any image below to see a larger version