Project Specifics

    The Husky Sunrise Energy Project, when in full production, will produce 200,000 barrels of oil per day. Steam assisted gravity drainage (SAGD) is the technology being used to recover the bitumen; this creates minimal surface land disturbance at the project site.

    Sonic’s e-houses are powering various parts of the SAGD process including Steam Generation, Water Treatment and Water De-Oiling. The 3 laboratories which we provided are used as the facilities in which Bitumen testing takes place to ensure the process is tuned for optimal quality.

    Sonic’s application know-how and experience across a diverse set of products was a key value creator for our client. We not only know how to design, size & package the electrical equipment to ensure compliance with specifications and code; we were able to also design and size all the air handling, safety, and electrical systems required for the Class II Laboratories. Since all of our engineering staff and trades are in-house, we’re able to provide clients with efficient cost effective solutions.

    Click on any image below to see a larger version